mon-fri 9-13 / 14.30-18.30
The H140_556 pedestrian barrier is a technical solution designed for flow regulation and safety enhancement in urban, commercial, and industrial settings. Characterized by an essential "T" design, the structure is engineered to act as a traffic moderator (pinch point): if installed at calibrated angles along cycle paths, it induces a visual narrowing that encourages spontaneous slowing of cyclists.
Made of galvanized steel with thick tubes (Ø102x4 mm), the barrier offers high impact resistance and permanent stability. Visibility is guaranteed by the zinc yellow RAL 1018 color, ideal for road signage and the delimitation of pedestrian areas. Weather protection is ensured by a full cycle of treatments including sandblasting, epoxy primer, and thermosetting powder coating polymerized at 180°C.
Image for illustrative purposes only
| Length in millimetres | 900.00 |
|---|---|
| Height in millimetres | 10.00 |
| fixing | da interrare |

Holity uses PayPal and credit transfer as methods of payment.
Credit Transfer
Paying by credit transfer the order will be handled only after a bank credit receiving confirmation.
Payment must be made within 7 days from date of order. Go past the deadline, the order will be automatically canceled. The bank transfer purpose must necessarily bring the order number, the order date and client name.
The products availability has to be judged only from the credited.
The payment must 'be made payable to: ' NAMITI SRL '
PayPal
Selecting the type of PayPal payment, you will be redirected to a page on the PayPal site where in you can enter with your email address and password and make payment.
Your financial data will not be shared with Holity but they will be handled directly by PayPal.
In case of order cancellation or rejection by Holity, the amount will be refunded to your PayPal account and Holity will be not responsible for delays and / or damage during repayment.
Upon delivery of the goods the customer is required to inspect:
In case of tampering and / or breaks the customer will immediately challenge the shipment and / or delivery putting the word "SUBJECT TO INSPECTION FOR GOODS ....." (give reasons) on the delivery receipt from the courier.
The customer then must report any damage within 7 (seven) days of receipt of goods in the manner prescribed by the operator chosen for the expedition. In case the customer fails to collect within 2 (two) working days of the goods ordered and present in storage at the warehouses of courier and / or the Company due to the repeated inability to deliver to the address specified by the customer with the order, will return the goods to stores in Namiti Ltd., with charge to the account of charges for transport and storage of goods, the customer may request a new shipment of the goods, upon payment of these expenses and the new shipping cost.