Professional pedestrian walkway in HDPE and steel (170x200 cm). 1000 kg load capacity, double ramp and integrated guardrails for safety on construction sites.
To know shipping costs, add the product to your cart
The h972_103 pedestrian walkway is a technical device designed to ensure the safe crossing of excavations, ditches and height differences within construction, road and industrial sites. The structure is engineered to meet temporary safety requirements, offering a stable and protected walking surface.
Built with a frame that combines HDPE (high-density polyethylene) and steel reinforcements, the walkway ensures high mechanical resistance combined with natural protection against oxidation and atmospheric agents. The surface is equipped with non-slip properties, essential for operations in adverse weather conditions or on muddy ground. Thanks to the integrated handle and optimized weight, handling can be easily managed by two operators, making it ideal for dynamic working environments.
Technical features
Main material: High-resistance HDPE (high-density polyethylene)
Structural reinforcements: Professional steel
Access configuration: 2 integrated ramps (front and back) for bidirectional access
Protection systems: Fixed lateral guardrails with a height of 1000 mm
Maximum load capacity: 1000 kg (distributed load)
External dimensions: 1700 mm (length) x 2000 mm (width) x 1080 mm (height)
Useful passage width: 1859 mm
Operating weight: 63 kg
Color: Black and gray for professional integration
Handling: Transport handle integrated into the structure
Image for illustrative purposes only
User benefits
Operational safety: the one-meter fixed guardrails drastically reduce the risk of accidental falls while crossing excavations.
Workflow efficiency: the double-ramp configuration allows simultaneous bidirectional transit, avoiding bottlenecks on the construction site.
High load capacity: the 1000 kg capacity allows the passage of not only personnel, but also heavy equipment and hand carts.
Environmental resistance: the use of high-density polyethylene guarantees the integrity of the structure even in the presence of humidity, mud and thermal shocks.
Simplified logistics: the integrated handle facilitates quick repositioning of the structure without the need for mechanical lifting equipment.
Scope of application
The h972_103 walkway finds its primary application in urban construction sites and in infrastructure maintenance, where it is necessary to create safe paths over excavations for pipes or cable ducts. It is widely used in industrial environments during plant shutdowns or renovations to connect areas separated by temporary height differences. Its useful width also makes it suitable in contexts where frequent transit of operators with bulky equipment or small manual transport units is required.
Why choose it
This walkway is the right choice when the primary need is to combine structural stability and mobility. Compared to makeshift solutions in wood or heavy metal, the H972_103 model offers a certifiable non-slip surface and standardized lateral protection. It is particularly suitable for operational scenarios where the site layout changes rapidly, requiring devices that can be moved manually without compromising the professional load capacity (1 ton).
FAQ
What is the advantage of HDPE compared to all-steel walkways?
HDPE offers superior resistance to corrosion and chemical agents, does not rust and maintains a low weight that allows manual handling, while guaranteeing, thanks to steel reinforcements, a capacity similar to heavy structures.
Does the walkway comply with construction site safety regulations?
Yes, the structure is designed with 1-meter high fixed guardrails and a non-slip surface, fundamental requirements for protecting workers against falls from height and slipping over excavations and elevation changes.
Can small motorized vehicles pass on the ramp?
Transit is allowed for total loads up to 1000 kg. Although designed for pedestrian use and hand carts, it can support light equipment as long as the weight is distributed and does not exceed the maximum indicated threshold.
Holity uses PayPal and credit transfer as methods of payment.
Credit Transfer
Paying by credit transfer the order will be handled only after a bank credit receiving confirmation. Payment must be made within 7 days from date of order. Go past the deadline, the order will be automatically canceled. The bank transfer purpose must necessarily bring the order number, the order date and client name. The products availability has to be judged only from the credited. The payment must 'be made payable to: ' NAMITI SRL '
PayPal
Selecting the type of PayPal payment, you will be redirected to a page on the PayPal site where in you can enter with your email address and password and make payment. Your financial data will not be shared with Holity but they will be handled directly by PayPal. In case of order cancellation or rejection by Holity, the amount will be refunded to your PayPal account and Holity will be not responsible for delays and / or damage during repayment.
Upon delivery of the goods the customer is required to inspect:
The number of packages delivered is as indicated in the transport document
The packaging is intact and not altered even in the closing strip
In case of tampering and / or breaks the customer will immediately challenge the shipment and / or delivery putting the word "SUBJECT TO INSPECTION FOR GOODS ....." (give reasons) on the delivery receipt from the courier.
The customer then must report any damage within 7 (seven) days of receipt of goods in the manner prescribed by the operator chosen for the expedition. In case the customer fails to collect within 2 (two) working days of the goods ordered and present in storage at the warehouses of courier and / or the Company due to the repeated inability to deliver to the address specified by the customer with the order, will return the goods to stores in Namiti Ltd., with charge to the account of charges for transport and storage of goods, the customer may request a new shipment of the goods, upon payment of these expenses and the new shipping cost.