The road signaling barrier is a collective protection device indispensable for the correct delimitation of construction sites and work areas. Designed to guarantee maximum visibility both day and night, it meets the need to protect operating personnel and vehicles in transit near excavations or risk zones. The structure includes metal supports that ensure correct vertical positioning on various types of road surfaces.
Technical specifications
Support material: Galvanized steel for high resistance to oxidation and atmospheric agents.
Dimensions: Width 120 cm x Height 100 cm.
Signage: Panel with red and white reflective oblique stripes to increase visibility in low light conditions.
Support system: Galvanized feet included for optimal stability on the laying surface.
Image purely indicative
User benefits
High visibility: The use of reflective films ensures that the barrier is clearly perceptible by drivers even in adverse weather conditions, reducing the risk of collisions.
Structural strength: The galvanization of the supports prevents corrosion, extending the useful life of the product even in outdoor environments exposed to rain and humidity.
Ease of installation: The compact 120 cm design allows for agile handling and rapid positioning without the use of heavy machinery.
Operational stability: The integrated supports offer a solid anchorage, avoiding tipping caused by gusts of wind or air displacements due to traffic.
Scope of application
The h632_36 device finds primary application in urban and suburban road construction sites, along the longitudinal sides of excavations and in all areas where physical separation between vehicle flow and the work area is necessary. It is also suitable for infrastructure maintenance, the delimitation of temporary pedestrian areas or the signaling of sudden obstacles on the roadway that require immediate safety intervention.
Why choose it
This barrier is the correct choice when a solution compliant with road safety regulations is needed that combines mechanical durability and reflective performance. Compared to plastic alternatives, the structure with galvanized supports offers superior stability in contexts where environmental stresses are frequent. It represents the minimum operational prerequisite for every company managing sites in areas with high pedestrian or vehicular traffic.
FAQ
What is the advantage of galvanized supports compared to painted ones?
Hot-dip galvanizing guarantees integral protection of the metal against rust, preventing the structural deterioration typical of painted components that can chip during handling on site.
Does the barrier comply with road signaling regulations?
Yes, the configuration with red and white reflective oblique bands is designed to comply with the visual signaling requirements provided for the delimitation of temporary construction sites.
Is it possible to connect multiple barriers together?
The h632_36 model is designed to be placed modularly to create continuous safety perimeters, ensuring a constant visual barrier along the entire perimeter of the construction site.
Holity uses PayPal and credit transfer as methods of payment.
Credit Transfer
Paying by credit transfer the order will be handled only after a bank credit receiving confirmation. Payment must be made within 7 days from date of order. Go past the deadline, the order will be automatically canceled. The bank transfer purpose must necessarily bring the order number, the order date and client name. The products availability has to be judged only from the credited. The payment must 'be made payable to: ' NAMITI SRL '
PayPal
Selecting the type of PayPal payment, you will be redirected to a page on the PayPal site where in you can enter with your email address and password and make payment. Your financial data will not be shared with Holity but they will be handled directly by PayPal. In case of order cancellation or rejection by Holity, the amount will be refunded to your PayPal account and Holity will be not responsible for delays and / or damage during repayment.
Upon delivery of the goods the customer is required to inspect:
The number of packages delivered is as indicated in the transport document
The packaging is intact and not altered even in the closing strip
In case of tampering and / or breaks the customer will immediately challenge the shipment and / or delivery putting the word "SUBJECT TO INSPECTION FOR GOODS ....." (give reasons) on the delivery receipt from the courier.
The customer then must report any damage within 7 (seven) days of receipt of goods in the manner prescribed by the operator chosen for the expedition. In case the customer fails to collect within 2 (two) working days of the goods ordered and present in storage at the warehouses of courier and / or the Company due to the repeated inability to deliver to the address specified by the customer with the order, will return the goods to stores in Namiti Ltd., with charge to the account of charges for transport and storage of goods, the customer may request a new shipment of the goods, upon payment of these expenses and the new shipping cost.